Client: | "FAIRPLAY PROPERTIES" REITs |
Architecture: | "CASTILLIA" Ltd. |
Main contractor: | "FAIRPLAY CONSTRUCTIONS" Ltd. |
BUILDING 1 (Stage 1) | |
Plan dimensions: | 41 / 19,5 m |
Stories (overground): | 8 |
Basements: | 1 |
Design: | Structures; Health & Safety Plan; Construction Waste Management Plan |
CGA - Construction Gross (building) Area: | 5 200 m2 |
Excavation with retaining structure: | "Berlin wall" - soldier (RC & steel) piles and timber lagging |
Main structural material: | cast in place reinforced concrete |
Structural type system: | skeleton-frame structure - columns, shear walls and flat slabs |
Structural grid spacing: | 7,2 / 6,25 m |
Foundation: | mat foundation with slab thickness of 70 cm |
Roof - type & material: | flat reinforced concrete slab |
Phase/stage: | in operation since 2017 |
BUILDING 2 (Stage 2) | |
Plan dimensions: | 46,5 / 41,5 m |
Stories (overground): | 8 |
Basements: | 1 |
Design: | Structures |
CGA - Construction Gross (building) Area: | 13 000 m2 |
Excavation with retaining structure: | 1.) "Berlin wall" - soldier (steel) piles and timber lagging |
2.) cast in place reinforced concrete piles | |
3.) soil nail shotcrete slope | |
Main structural material: | cast in place reinforced concrete |
Structural type system: | skeleton-frame structure - columns, shear walls and flat slabs |
Structural grid spacing: | 6,4 / 6,25 m |
Foundation: | mat foundation with slab thickness of 70 cm |
Roof - type & material: | flat reinforced concrete slab |
Phase/stage: | in operation since 2017 |
BUILDINGS 3 & 4 (Stage 3) | |
Plan dimensions: | 66,5 / 57,5 m |
Stories (overground): | 6 |
Basements: | 1 |
Design: | Structures |
CGA - Construction Gross (building) Area: | 17 100 m2 |
Excavation with retaining structure: | "Berlin wall" - soldier (RC & steel) piles and timber lagging |
Main structural material: | cast in place reinforced concrete |
Structural type system: | skeleton-frame structure - columns, shear walls and flat slabs |
Structural grid spacing: | 6,5 / 6,5 m |
Foundation: | mat foundation with slab thickness of 60 cm |
Roof - type & material: | flat reinforced concrete slab |
Phase/stage: | in operation since 2018 |