Client: "BIOORGANIC BULGARIA" Ltd.
Architecture: "PROGRESS PERFECT DESIGN" Ltd.
Main contractor: "DRY BUILDING" Ltd.
Plan dimensions: 60 / 45 m
Stories (overground): 2
Basements: 0
Design: Structures
CGA - Construction Gross (building) Area: 2 300 m2
Excavation with retaining structure: non retaining open excavation with slopes and berms
Main structural material: cast in place reinforced concrete, structural steel
Structural type system: steel frame skeleton structure (columns and girders) + intermediate steelwork RC slab
Structural grid spacing: 12 / 6 m
Foundation: ribbed mat foundation - cast in place RC footings (under columns and walls) with connecting beams
Roof - type & material: steel structure gable roof
Phase/stage: in operation since 2018
 
×