Client: "MM WORLD" Ltd.
Architecture: “IVO PETROV – ARCHITECTS” Ltd.
Main contractor: "TIM Technology" Ltd.
Plan dimensions: 57 / 27,5 m
Stories (overground): 9 / 10
Basements: 2 / 3
Design: Structures
CGA - Construction Gross (building) Area: 10 700 m2
Excavation with retaining structure: not supported RC diaphragm walls
Main structural material: cast in place reinforced concrete
Structural type system: skeleton-frame structure - columns, shear walls and flat slabs
Structural grid spacing: 7,2 / 5,4 m
Foundation: mat foundation with slab thickness of 90 cm
Roof - type & material: flat reinforced concrete slab
Phase/stage: in operation since 2015
 
×